Impact Factor
7.883
Call For Paper
Volume 12 Issue 07
July 2026
Author(s)
B S Mohan1,2, 3, Deepthi Iyer B Preethu Nath M Shamanth G Bharadwaj,Sindu N
Abstract
Completion Of The Lab Experiment Picked During Continuous Internal Evaluation (CIE) Or Semester End Exam (SEE), Evaluator Checks For The Calculations And Verifies The Results Manually. This Paper Discusses On Validation Of The Experiment Carried Out Over
Keywords
DC Machine
Load Test On Shunt Motort
Generator
Compound Generator Etc
Paper ID
IJSARTV4I422602
Publication Date
April 12, 2018
Research Area
Electrical And Electronics Engineering