Impact Factor: 7.883
Submit Paper
Volume 5, Issue 7 (July 2019)

Study Of Method's To Reduce Waste Due To Rework And Checking It's Effectiveness By Cost Time Analysis: Case Study At Hadapsar Pune

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Desai Pradnya Ashok Patil Satyajit B.

Abstract

Rework In Construction Projects Is Mainly Stated As The Repetition Of Activity Or Wasting Unnecessary Efforts For Redoing Same Process Or Activity, Which Was Incorrectly Implemented In First Instance. Rework Can Adversely Affect The Performance, Productiv


Keywords

Paper ID

IJSARTV5I733051

Publication Date

July 22, 2019

Research Area

Rework Waste

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!