Impact Factor: 7.883
Submit Paper
Volume 4, Issue 4 (April 2018)

Study Of Factors For Cost Overrun In Road Construction Projects

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Mr. Pranav K. Lende Prof. Aradhana D. Rathod

Abstract

India Has A Road Network Of Over 4,236,000 Kilometers In 2011, The Third Largest Road Network In The World. At 0.66 Km Of Roads Per Square Kilometer Of Land, The Quantitative Density Of India's Road Network Is Similar To That Of The United States (0.65) A


Keywords

Cos Toverruns; Road Construction Projects ; Quantitative Density ; Time And Quality.

Paper ID

IJSARTV4I422194

Publication Date

April 1, 2018

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!