Impact Factor
7.883
Call For Paper
Volume 12 Issue 07
July 2026
Author(s)
Mr. Pradip D.Shinkar Mrs S.V.Pataskar
Abstract
BRTS (Bus Rapid Transit System) Is The New Upcoming Transportation System In Pune. But BRT Can Only Be Successful If It Is Time Saving And Cost Saving To The People Using It. In The Vehicle Routing Problem (VRP) A fleet Of Vehicles With Limited Capacity Ha
Keywords
To Facilitate The People Using BRTS
Save Time
Save Money
Control The Pollution Level
Paper ID
IJSARTV4I523515
Publication Date
May 14, 2018
Research Area
Civil Engineering