Impact Factor: 7.883
Submit Paper
Volume 3, Issue 6 (June 2017)

Study & Application Of Line Of Balance (lob) Method For Mivan Construction In Residential Project

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Mr. Trahash K. Matey Col. B. K. Bhonde Asst. Prof. Asst . Prof. Sudhanshu Pathak

Abstract

Linear Scheduling Methods Is Best Suited To Projects That Display Repetitive Characters But Their Use In The Construction Industry Is Limited. Line Of Balance Is Linear Scheduling Method That Also Makes Use Of Network Technology. The Line Of Balance Metho


Keywords

Line Of Balance (LOB); Repetitive Nature; Scheduling; Flow Line Chart Gantt Chart.

Paper ID

IJSARTV3I615572

Publication Date

June 7, 2017

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!