Schedule Performance Of Construction Project By Using Weibull Analysis

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Akash G. Charbhe Prof. A. A. Suryavanshi Prof. Sudhanshu Pathak Prof. S. V. Pataskar

Abstract

In Every Project, Construction Managers Regularly Monitor Projects To Ensure That The Project Performance Is Under Control. Traditionally, The Earned Value Method (EVM) Is Widely Used Tool To Control And Monitor Schedule Performance Using The Schedule


Keywords

Construction; Cost Control; EVM; Schedule Performance; Weibull Analysis.

Paper ID

IJSARTV3I18193

Publication Date

January 3, 2017

Research Area

Civil Engineering