Impact Factor: 7.883
Submit Paper
Volume 4, Issue 5 (May 2018)

Planning, Scheduling, Resource Management And Onsite Safety For A Flyover Project: A Case Study At Vmc

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Gaurav Singh Roshan Rai

Abstract

A Case Study- Flyover Project Has Been Selected In Kota (Rajasthan), To Monitor The Planning, Scheduling, Resource Management And Onsite Safety. Proper Planning And Scheduling Of The Project Helps To Track The Project And Minimize The Chance Of Delay In P


Keywords

Planning Resource Management HIRA JSA Primavera.

Paper ID

IJSARTV4I523631

Publication Date

May 23, 2018

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!