Planning, Monitoring And Scheduling For Mid Rise Multi-story Building Using Microsoft Project

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Komal Malviya Bikesh Tripathi

Abstract

The Efficient Use Of Scheduling Tools, Such As Gantt Charts, To Plan And Then Provide Progress Reports Within The Project Context Is Correlated With Project Planning, Which Is A Crucial Component Of Project Management. The Numerous Challenges Encountered Throughout The Project Were Also Recognised And Resolved. Additionally, The Conventional Method Is Time-consuming. With The Aid Of A Case Study Of A Project Being Carried Out In India, The Given Work Will Provide Them The Chance To See The Benefits Of Microsoft Project (MSP), Which Expedites Construction And Makes The Project Cost-effective With Proper Planning. An Examination Of A High-rise Residential Building Located In Bicholi Mardana, Indore (M.P.), Was Taken Into Consideration For The Current Project. Additionally, Utilising The Blueprints And Drawings Provided By The Site Officials, A Detailed Estimate Was Supplied. The Project's Overall Length Was Determined, And Microsoft Project Software Was Used To Schedule The Tasks And Activities.


Keywords

Project Management Scheduling Multi Dwelling Construction Management Project Management Software.

Paper ID

IJSARTV12I3104665

Publication Date

March 8, 2026

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!