Impact Factor
7.883
Call For Paper
Volume 12 Issue 07
July 2026
Author(s)
Susmita S Bodhe Dr.P.B. Nagarnaik
Abstract
Sewage Treatment Plant Under Examination Has 400 KLD Limit And Is Situated In Besa. It Gets Sewage From The Encompassing Local Locations And After Three Phase Treatment, Treated Effluent Is Provided Back To Meet Water Necessity For Different Purposes. Thi
Keywords
BOD
COD
TSS
TDS
Treated Effluent
Reuse.
Paper ID
IJSARTV6I537723
Publication Date
May 29, 2020
Research Area
Civil Engineering