Impact Factor: 7.883
Submit Paper
Volume 2, Issue 4 (April 2016)

Lead Time Reduction Using Value Stream Mapping In Powder Metallurgy Based Industry.

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Tushar Pritlal Lilhare B.U Sonawane Milind Gaikwad Santosh Dhanwate

Abstract

Due To High Uncertainty In Supply And Demand In Automobile Industry There Is A Long Waiting Time For The Product And Hence Due To This Many Manufacturers Lose Their Customers. Thus In Order To Meet The Market Demand, The Industries Are Required To Red


Keywords

Lean Manufacturing Value Stream Mapping Lead Time.

Paper ID

IJSARTV2I43147

Publication Date

April 23, 2016

Research Area

Lean Manufacturing

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!