Impact Factor: 7.883
Submit Paper
Volume 11, Issue 10 (October 2025)

Integration Of Cost And Work Breakdown Structures In The Management Of Construction Projects Considering A Case Study Of Commercial Structure In Indore

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Shailendra Kumar Patel Hitesh Kodwani

Abstract

Effectively Organising The Progress Is A Crucial Component Of Project Management. Every Task In The Management Industry Begins With Planning. Planning Is The Foundation For Carrying Out, Overseeing, Managing, And Wrapping Up A Project. In Order To Manage The Project, A Work Breakdown Structure Is Used To Hierarchically Decompose The Target Objectives, Activities, Sub-activities, And Work Packages. A Commercial Building Project In Indore, India, Serves As The Focus Of This Study, Which Investigates The Integration Of Work Breakdown Structure (WBS) And Cost Breakdown Structure (CBS) In Construction Project Management. Project Scope, Scheduling, And Cost Control Must All Be In Harmony For Construction Projects To Be Managed Effectively And Provide Results On Time And Under Budget. Coordination And Risk Management Have Been Difficult Since CBS And WBS Have Always Been Viewed As Distinct Frameworks. In Summary, The Study Shows That Using Integrated Breakdown Structures In A Strong Project Management Tool Greatly Improves Construction Projects' Accuracy, Efficiency, And Success. This Information Is Helpful For Researchers And Practitioners In The Field.


Keywords

Planning Scheduling Microsoft Project Work Breakdown Structure.

Paper ID

IJSARTV11I10104162

Publication Date

October 23, 2025

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!