Impact Factor
Call For Paper
Volume 12 Issue 07
July 2026
Author(s)
Abstract
Effectively Organising The Progress Is A Crucial Component Of Project Management. Every Task In The Management Industry Begins With Planning. Planning Is The Foundation For Carrying Out, Overseeing, Managing, And Wrapping Up A Project. In Order To Manage The Project, A Work Breakdown Structure Is Used To Hierarchically Decompose The Target Objectives, Activities, Sub-activities, And Work Packages. A Commercial Building Project In Indore, India, Serves As The Focus Of This Study, Which Investigates The Integration Of Work Breakdown Structure (WBS) And Cost Breakdown Structure (CBS) In Construction Project Management. Project Scope, Scheduling, And Cost Control Must All Be In Harmony For Construction Projects To Be Managed Effectively And Provide Results On Time And Under Budget. Coordination And Risk Management Have Been Difficult Since CBS And WBS Have Always Been Viewed As Distinct Frameworks. In Summary, The Study Shows That Using Integrated Breakdown Structures In A Strong Project Management Tool Greatly Improves Construction Projects' Accuracy, Efficiency, And Success. This Information Is Helpful For Researchers And Practitioners In The Field.
Keywords
Paper ID
IJSARTV11I10104162
Publication Date
October 23, 2025
Research Area
Civil Engineering