Impact Factor: 7.883
Submit Paper
Volume 10, Issue 5 (May 2024)

Improvement Of Lead Time In Air Compressor Manufacturing Sme Using Value Stream Mapping

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Manikanda Prasath K Ezhil M

Abstract

Indian SME’s Find It Difficult To Boost Customer Satisfaction. These Days, Every Manufacturing Business Aims To Boost Productivity While Cutting Waste That Arises During The Production Of A Product. The Lean Mindset Is Very Focused On Cutting Waste. Lean


Keywords

Small Medium Enterprises (SME) Value Stream Mapping (VSM) Lean Manufacturing (LP) Non Value Added Activities (NVA) Value Added Activities (VA)

Paper ID

IJSARTV10I590880

Publication Date

May 6, 2024

Research Area

Manufacturing

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!