Fidic And Its Apllication In Extension Of Time And In Disputes And Arbitration

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Katravath Kavya Nayak Sushil Kulkarni Aditi Sonawane

Abstract

Study Of Need Of FIDIC Like Structured Contract Book In India For Different Types Of Works In Construction Industry Of India. Extension Of Time For Completion Clause Will Be Studied Has It Is Needed Due To Delays Are Caused By Having Much Larger Member Of


Keywords

FIDIC DAAB EOT Contract CEAI NACE Etc.