Impact Factor
7.883
Call For Paper
Volume: 12 Issue 03 March 2026
LICENSE
Enviornmental Impact Assessment On Joshimath Accident
-
Author(s):
Shruti Kailas Deshmukh
-
Keywords:
Hydroelectric Project, National Highway, Enviornmental Assessment
-
Abstract:
Environmental Impact Assessment Of The Joshimath Accident , Which Happened In 2023 , Which Was Because Of The North Proper Environmental Impact Assessment For The Location , Which Was Assigned For The National Highway Project , Along With The Chardham Yatra Project . Joshimath Is In Between Haridwar And Badrinath, Which Connects 2 Important Chardham Locations Along With That.This Area Was Famous For The Joshi.Math Temple Which Was Built By The Adi Shankaracharya Recently, A Hydroelectric Project Also Assigned To This Location In The Uttarakhand Because Of This, This Location Is Having The Mud Soil, Which Is Loose Mud Soil, Which Literally Had A Accident Of Cracks Were Also Expected In Walls Of House And The Project Of National Highway Road Washed Off Due To The Landslide In That Area Because Of Which Many People Have To Loss Of Their Belongings, If A Proper . Environmental Impact Assessment Would Have Been Done That Place.This Problem Wouldn't Have Happened So Because Of That.Recently , A Environmental Impasse Assessment Have Been Done At That Place And There Are Some Lacunas In It Which Can Be Improved , Which I Have Mentioned In My Synopsis Further
Other Details
-
Paper id:
IJSARTV11I7103894
-
Published in:
Volume: 11 Issue: 7 July 2025
-
Publication Date:
2025-07-17
Download Article