Impact Factor: 7.883
Submit Paper
Volume 11, Issue 6 (June 2025)

Enhancing Efficiency Through Strategic Equipment Management In Highway Construction

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Vaibhav Sonone Pranav Lende

Abstract

Highway Construction Projects Are Capital-intensive, With Equipment Management Playing A Pivotal Role In Determining Project Efficiency, Cost-effectiveness, And Timely Completion. This Thesis Investigates The Enhancement Of Operational Efficiency In Highway Construction Through Strategic Equipment Management Practices. By Analyzing Current Industry Approaches, The Study Identifies Inefficiencies Such As Equipment Downtime, Underutilization, And Suboptimal Maintenance Schedules, Which Contribute To Delays And Cost Overruns. The Research Proposes A Comprehensive Framework Integrating Advanced Technologies, Data-driven Decision-making, And Optimized Resource Allocation To Address These Challenges.


Keywords

Project Efficiency Cost-effectiveness Suboptimal Maintenance Schedules

Paper ID

IJSARTV11I6103813

Publication Date

June 22, 2025

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!