The Construction Sector Creates A Significant Amount Of Jobs And Is Essential To The Nation's Socioeconomic Development.The Aim Of This Research Is To Determine And Examine The Key Elements That Impact Construction Project Performance By Causing Time And Expense Overruns. Numerous Aspects Are Covered In This Study, Including Inadequate Project Planning And Scheduling, Issues With Subcontractors, Poor Site Management And Supervision, Material Management Issues, A Lack Of Collaboration Among Stakeholders, Etc. According To The Study's Conclusions, The Ishikawa Diagram Is A Valuable Tool For Determining And Analysing The Causes And Effects Of Labour, Material, And Equipment-related Delays. Thus, It Can Assist Project Managers In Ensuring That The Project Is Completed Smoothly And Within The Budget And Time Frame That Have Been Set.Implementing Efficient Material Management Is Essential For Timely Procurement And Inventory Issuance To Minimise Delays Caused By Material Shortages, As Materials Account For Roughly 70% Of The Total Cost Of Construction. Its Utilisation Can Be Maximised With No Waste By Implementing Resource Levelling And Smoothing. According To This Study, Building Projects May Be Made To Be Completed On Time And Within Budget By Using Contemporary Project Management Tools Like Microsoft Project, Primavera, Newton Software, And Others To Effectively Monitor The Project Schedule.
Keywords
Paper ID
IJSARTV12I3104670
Publication Date
March 8, 2026
Research Area
Civil Engineering