Impact Factor: 7.883
Submit Paper
Volume 5, Issue 6 (June 2019)

Development And Study Of New Leveling Head (wedge) To Replace Three Foot Screw Leveling Head In Surveying Instruments.

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Vikas Dattatreya Harage Nikhil Sanjay Kumbhar | Akash Daundkar Mayur Ghadage Prof. S. D. Patil

Abstract

The Planning And Design Of Civil Engineering Project Such As Construction Of Highway, Bridge, Tunnel, Dam Etc. Are Based Upon Surveying Measurements. For Surveying We Needs To Level The Instrument With Three Foot Screw For Every Change Point Which Make Su


Keywords

Advanced Leveling Leveling Head Survey Instrument Wedge Leveling.commerce

Paper ID

IJSARTV5I632734

Publication Date

June 5, 2019

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!