Impact Factor: 7.883
Submit Paper
Volume 7, Issue 1 (January 2021)

Design, Planning And Cost Estimation Of A G+5 Residential Building

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Mr. Akshay Patil Mr. Manas Rathore

Abstract

Any Construction Project To Begin With Starts With The Layout Of The Building Or Structure Followed By Design And Analysis Of The Structure Which Is Succeeded By Cost Estimation And Planning For The Said Project. This Project Involves The Layout, Design,


Keywords

Staad Pro Cost Estimation Design Planning Autocad.

Paper ID

IJSARTV7I141821

Publication Date

January 2, 2021

Research Area

NA

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!