Impact Factor: 7.883
Submit Paper
Volume 3, Issue 3 (March 2017)

Design And Development Of Solar Panels Cleaning System

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Akash Ligam Sandeep Mathe Ranjit Patil Siddhesh Shrinath, Prof. Swapnil Mane

Abstract

As Per Jawaharlal Nehru National Solar Mission, The Govt. Of India Sets The Ambitious Target Of Increasing The Generation Of Solar Power To 100 GW By 2022. Solar Panel Manufacturers Are Thriving For Improvement In Efficiency From Every Batch Of Their Prod


Keywords

Solar Mission Solar Panel Dust Cleaning Efficiency

Paper ID

IJSARTV3I38658

Publication Date

March 24, 2017

Research Area

Mechanical Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!