Delay Analysis Of Flyover Bridge Using Primavera : A Review

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Anupam Sharma Hitesh Kodwani

Abstract

Indian Construction Industry Is Growing Quickly And Huge Development Projects Are Going On. Most Certainly It’s Justifiably Or In A Roundabout Way Connected With The Indian Economy, The Speed With Which Projects Complete Have Appeared To Influence The GDP Of The Country. Appropriate Scheduling And Planning Are Substantial In Construction Projects For Decreasing And Controlling Postponements Of The Project, While An Error In The Same Causes Squandering Of A Significant Quantity Of Time, Capital, Resources, And Quality. Despite Firm Principles And Policies, The Monitoring Process May Be Inefficient Because Of The Practical Problems Prevailing Or Rising In The Project. An Attempt Has Been Made In Realizing The Practical Problems In Project Execution Will Contribute To Proper Recognition Of The Problem Areas And Implementing Mitigation. In This Paper Presenting Literature Survey And Publications Related To Analysis Of Project Management


Keywords

Flyover Bridge Delay Factors Project Scheduling Project Updating Project Crashing.

Paper ID

IJSARTV11I7103882

Publication Date

July 13, 2025

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!