Delay Analysis Of Flyover Bridge Using Primavera : A Review

  • Author(s):

    Anupam Sharma | Hitesh Kodwani

  • Keywords:

    Flyover Bridge, Delay Factors, Project Scheduling, Project Updating, Project Crashing.

  • Abstract:

    Indian Construction Industry Is Growing Quickly And Huge Development Projects Are Going On. Most Certainly It’s Justifiably Or In A Roundabout Way Connected With The Indian Economy, The Speed With Which Projects Complete Have Appeared To Influence The GDP Of The Country. Appropriate Scheduling And Planning Are Substantial In Construction Projects For Decreasing And Controlling Postponements Of The Project, While An Error In The Same Causes Squandering Of A Significant Quantity Of Time, Capital, Resources, And Quality. Despite Firm Principles And Policies, The Monitoring Process May Be Inefficient Because Of The Practical Problems Prevailing Or Rising In The Project. An Attempt Has Been Made In Realizing The Practical Problems In Project Execution Will Contribute To Proper Recognition Of The Problem Areas And Implementing Mitigation. In This Paper Presenting Literature Survey And Publications Related To Analysis Of Project Management

Other Details

  • Paper id:

    IJSARTV11I7103882

  • Published in:

    Volume: 11 Issue: 7 July 2025

  • Publication Date:

    2025-07-13


Download Article