Impact Factor
7.883
Call For Paper
Volume 12 Issue 07
July 2026
Author(s)
S. Dharunkumar M. Balaji
Abstract
This Project Aims At Reducing The Timetaken For Building A Bus Body.Building A Bus Body Takes More Than Three Months Which Could Be Reduced. The Wastage Of The Material Could Be Reduced From 20% By Purchasing The Appropriate Size Or Dimensions Of The Mate
Keywords
Cost Estimation
Bus Coach Building
Re-engineering.
Paper ID
IJSARTV9I769253
Publication Date
July 20, 2023
Research Area
Industrial Engineering