High Impact Factor : 7.883
Submit your paper here

Impact Factor

7.883


Call For Paper

Volume: 11 Issue 06 June 2025


Download Paper Format


Copyright Form


Share on

Comparative Analysis Of 5d Bim Using Msp And Navisworks For Construction Project Management

  • Author(s):

    Shrirang Milind Chikhalkar | Pushpak Gajanan Jawanjal | Riya Anil Wankhede | Sagar Nandkishor Sonawane | Rohan Vilas Ambekar

  • Keywords:

    Building Information Modeling (BIM), Quality Management, 5D BIM, MSP, Navisworks, Construction Project Management

  • Abstract:

    This Paper Investigates The Integration Of 5D Building Information Modeling (BIM) With Microsoft Project (MSP) And Autodesk Navisworks For Quality Management And Project Lifecycle Optimization. A Case Study Of The Pride Purple Square Commercial Building In Pune, India, Forms The Basis Of This Comparative Analysis. 3D Models Were Created In Revit, Integrated With 4D Scheduling And 5D Cost Estimation In Both MSP And Navisworks Environments. The Study Highlights How BIM-based Workflows Improve Visualization, Cost Control, And Clash Detection Compared To Conventional Approaches. Results Show That Navisworks Offers Superior Clash Detection And 4D/5D Simulation Capabilities, While MSP Provides Robust Scheduling Features. Recommendations For Improved BIM Adoption In India Are Also Discussed.

Other Details

  • Paper id:

    IJSARTV11I6103765

  • Published in:

    Volume: 11 Issue: 6 June 2025

  • Publication Date:

    2025-06-09


Download Article