Impact Factor: 7.883
Submit Paper
Volume 4, Issue 7 (July 2018)

Assessment Of Selected Parameters In Bellandur Lake, Begaluru

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Sneha Das Lokeshappa.B.

Abstract

Though India In The Modern World Is Ahead Of Many Countries In Economic Growth, It Has A Fall Back Of Resource Scarcity, Especially Water. Since All The Major Industries Use A Ton Of Fresh Water Per Day For Their Production, It Leaves A Major Impact On Th


Keywords

Bellandur Lake Bengaluru DO COD BOD NH3-N PO4- TDS Turbidity EC Nitrate.

Paper ID

IJSARTV4I724400

Publication Date

July 13, 2018

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!