Assessment Of Equipment Management In Four Lane Highway: A Case Study Of Latur

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Mr. Vinay B. Shinde PROF. Pranav Lende

Abstract

Construction Equipment Is One Of The Major Resources In The Construction Process For Construction Companies Through The Mechanized Construction Of Road Projects. Construction Equipment Planning And Management Practice Lack The Necessary Policy To Meet The


Keywords

Equipment Planning Equipment Management Cost Overrun Utilization