Impact Factor: 7.883
Submit Paper
Volume 11, Issue 4 (April 2025)

An Assessmentof The Factors Causing Time Delay On Residential Building Construction

Impact Factor
7.883
Call For Paper
Volume 12 Issue 07

July 2026

Download Paper Format
Copyright Form
Share on:

Author(s)

Sudharsan K Soundhirarajan K Karthikeyan M

Abstract

In Moment's Global Economy, The Domestic Structure Sedulity Is One Of The Nippy- Growing Sectors. Design Directors Place A High Significance On Quality. For A Civil Architect, Quality Issues Can Be Exceedingly Frustrating. Owners And Engineers Are Concerned About Quality Issues That Have Grown More Wide Than Anticipated In This Terrain. It's The Primary Purpose Of This Disquisition To Discover And Examine The Factors That Determine The Quality Of Construction. Time Operation, Vacuity Of Resources, Financial Issues, Labours, Environmental Conditions, Paraphernalia And Outfit Used, Lack Of Safety, Collaboration Of Actors, Design, Lack Of Communication, Selection Of Contractor, Examination, Canons And Morals, Execution, And Top Operation Support Are The Linked Factors From The Literature. In Order To More Understand Why Construction Systems In Trichy Were Delayed During The Covid- 19 Epidemic, This Study And Exploration Have Been Put Together. After Carrying Data From A Check Of A Wide Spectrum Of Trichy- Predicated Construction Professionals, This Study Looked Into The Pivotal Causes Of Detainments. Predicated On An Significance Index, This Study Set Up The Most Current Reasons Of Detainments In Domestic Structure Systems, And The Primary Conclusions From The Data Might Help The Construction Sedulity More Understand Not Only The Major Causes Of Detainments But Also How To Limit Them Through Applicable Planning.


Keywords

Paper ID

IJSARTV11I4103417

Publication Date

April 30, 2025

Research Area

Civil Engineering

Submit Your Paper to IJSART

Join the global research community with IJSART. Submit your paper, share your work, and gain worldwide recognition!