Impact Factor
7.883
Call For Paper
Volume 12 Issue 07
July 2026
Author(s)
Sourabh Shivaji Rasale Prathamesh Sanjay Gaikwad Deepak Laxman Nimbalkar Nikhil Kisan Atole | Dinesh .W. Gawatre
Abstract
To Providing A Strategic Frame Work With BIM Leveraged Approach. The Key Of This Framework Was The Information Generation, Exchange, Collection And Management. This Study Has Contributed To Existing Knowledge With An Extensively List Of Key Benefits To D
Keywords
Failure Mode And Effects Analysis
Constructability
AEC Industry
Contractor
Change Orders
BIM Software
Clash Detection
Building Information Modelling
Requests For Information
Paper ID
IJSARTV7I649935
Publication Date
June 14, 2021
Research Area
Civil Engineering