Impact Factor
7.883
Call For Paper
Volume 12 Issue 07
July 2026
Author(s)
Mr. Pankaj Chauhan Mr. R.S. Desai Ms. Shushree Shweta Mr. Wasiullah
Abstract
The Project Is Designed To Develop An Automatic Tripping Mechanism For The Three-phase Supply System. The Project Output Resets Automatically After A Brief Interruption In The Event Temporary Fault While It Remains In Tripped Condition In Case Of Perm
Keywords
Comparator
IC555
Relay Driver
Relay.
Paper ID
IJSARTV3I515468
Publication Date
May 31, 2017
Research Area
Electrical Engineering